Skip to content
Suntask

Rooftop solar for Rajasthan, end to end.

Solar you never have to worry about.

In-house engineers. In-house monitoring. All paperwork handled, your plant looked after, and a team that answers the phone.

Check my subsidy & EMI
A technician on the roof of a house, panels going up under a clear sky

Live

Plant 214 · Bank branch, Sikar · 10 kW

Today

38.2kWh

Generation health

Excellent

Illustrative RMS view

  • 370+

    plants built & maintained

    across Rajasthan

  • In-house

    engineers & technicians

    no subcontractors

  • RMS

    our monitoring platform

    on every plant

  • 1 day

    to install up to 10 kW

    paperwork filed by us

On the rooftops of

  • State Bank of India
  • Bank of Baroda
  • Rajasthan Gramin Bank

Money made simple

₹0-investment solar, with the maths.

For most homes the subsidy covers the down payment and the monthly saving covers the EMI. Nothing upfront, and about what you paid the DISCOM, for a plant that ends up yours. Loans at about 7%* via leading banks under PM Surya Ghar, or EMI through our group financing arm. One application; the subsidy lands in your account, not ours.

Check my subsidy & EMI

A 3 kW home, month by month

EMI at about 7% over 10 years₹18,500 upfront; the ₹78,000 subsidy lands in your account at month 3
≈ ₹1,930
After the ₹78,000 subsidy prepays the loan
≈ ₹1,010
The electricity it replaces, about 369 units a month
≈ ₹2,580

*Rate varies by bank. Illustration on Suntask's 3 kW price, ex-GST; the same maths as the financing page. Exact figures in your proposal.

How it works

End to end, in four steps.

From first visit to subsidy credit, one team does everything. Each step is scheduled so the next never waits.

  1. 1

    Free audit, survey and 3D design

    A Suntask engineer visits within 3 working days, measures the roof and what shades it, and shows you a 3D design of your home with the panels on it.

    3 working days · 3D design in 30 minutes

  2. 2

    Fixed quote in 48 hours

    Sized from your actual bills and the 3D design you approved, priced off a published card. No haggling theatre.

    48 hours

  3. 3

    Installed fast, filed fully

    Up to 10 kW installed in a single day. DISCOM, net metering and subsidy paperwork done by us.

    1 day for up to 10 kW

  4. 4

    Monitored and maintained, long term

    Live monitoring, five years of service and warranty claims handled for you. You watch the savings; we watch the plant.

    10 years

Step one

One free bill audit. No obligation.

भरोसा पहले, सोलर बाद में।

Tell us your monthly bill and PIN code. Our team replies on WhatsApp within 15 minutes, 9am to 7pm.

This is for my

We check it against the districts our technicians already cover.

Monthly electricity bill

Reply on WhatsApp within 15 minutes (9am–7pm).

RMS · live monitoring

Your plant, live on your phone.

Every plant we build reports to RMS, the monitoring platform we built to run a fleet of hundreds. Generation, a daily health grade and alerts, live on your phone. When an array goes dirty or an inverter drops out, we usually know before you do.

SoonRMS mobile app · Coming soon on Android and iOS

Fleet view5 of 370+ plants · illustrative
  • Bank branch · Sikar

    10 kW · No open tickets

    38.2 kWh

    Excellent
  • Bank branch · Jaipur, MI Road

    8 kW · No open tickets

    29.1 kWh

    Good
  • Home · Vaishali Nagar

    3 kW · Cleaning booked

    9.4 kWh

    Needs attention
  • Factory · Sitapura

    100 kW · No open tickets

    371 kWh

    Excellent
  • Bank branch · Kota

    10 kW · Inverter offline · ticket open

    0.0 kWh

    Needs attention
Bank branch · Sikar · todayExcellent

Units generated, by half hour

Questions

Straight answers.

Every question, answered
How long does installation take?

Most home systems up to 10 kW are installed in a single day once you have approved the 3D design. Net-metering and subsidy paperwork run alongside, handled by us.

Will I see the design before I pay?

Yes. The engineer who surveys your roof builds a 3D design of your home with the panels, inverter and cable run in place, within 30 minutes of the visit. You approve it before we quote, and nothing is drilled until you have.

Who maintains the system after installation?

We do. Every plant reports to RMS, our in-house monitoring platform, and is serviced by our in-house technicians. Five years of service are included with every plant we build; renew yearly from year six, for up to 10 years.

Who handles a warranty claim?

We do. Panels, inverter and battery carry the manufacturer's warranty, stated by make and model in your proposal. If a part fails, we raise the claim with the maker, follow it through, and fit the replacement.

Do I have to handle the subsidy application myself?

No. We file the PM Surya Ghar application, the DISCOM paperwork and the net-metering request. The subsidy is paid directly into your bank account.

Which areas do you serve?

All of Rajasthan, with the fastest surveys in Jaipur and the districts where our technicians are already based. Enter your PIN code in the form and we will tell you straight.

WhatsAppFree bill audit