Factory solar · MSME and C&I
Cut power cost by up to 60%.
Payback in 3–5 years. Engineered, financed and maintained by the team behind one of Rajasthan's largest solar fleets.
Bill audit in 24 hours
Send a photo of your last electricity bill on WhatsApp. An engineer replies with a savings estimate within one working day.
Or use the form below with your bill band.

The economics
Grid: ₹8.50. Your roof: about ₹3.
Solar replaces your most expensive daytime units first. With payback in 3–5 years, every year after that is close to free power.
Input tax credit and accelerated depreciation
GST paid on the plant is claimable as input credit, and solar assets qualify for accelerated depreciation. Ask your CA, or ours.
Cost per unit in Rajasthan
- Commercial tariff
- ≈ ₹8.50
- Industrial tariff
- ≈ ₹6.50
- Rooftop solar, levelised over plant life
- ≈ ₹3.00
Tariffs vary by DISCOM and slab; the audit uses your bill.
Engineering credibility
Drawings first, then panels.
3D layout and single-line diagram
Every shed modelled in 3D with a shadow study before the proposal, then designed on a signed SLD with protection and earthing to the DISCOM's standard.
Structure calculations
Wind-load and roof-load calculations for your shed or RCC roof, not a generic mount.
ALMM and DCR compliance
Listed modules and inverters, documented by make and model in the proposal.
Safety record
Permit-to-work, harnessed crews and a fleet safety record we will show you on request.
Where we already work
Sitapura. VKI. Bagru. Bhiwadi.
Our technicians are already in the industrial clusters around Jaipur and on the NCR border, which means faster surveys and faster service calls.
Factory references
Before you commit, we put you in touch with a plant owner in your cluster.
Ways to pay
Own, finance, or buy the power.
CAPEX
Buy the plant outright. Fastest payback, full depreciation benefit, the plant is yours from day one.
EMI
Finance through our group arm or your bank. Savings typically cover the instalment from month one.
OPEXSoon
Pay per unit with no upfront cost. Available for larger sites; ask us about eligibility.
RMS fleet view
Every unit, every shift, one screen.
Multi-unit owners see all plants in a single fleet view: a generation health grade per plant, alerts by site, monthly reports for the board. The same platform that watches hundreds of bank branches.
SoonRMS mobile app · Coming soon on Android and iOS
Bank branch · Sikar
10 kW · No open tickets
38.2 kWh
ExcellentBank branch · Jaipur, MI Road
8 kW · No open tickets
29.1 kWh
GoodHome · Vaishali Nagar
3 kW · Cleaning booked
9.4 kWh
Needs attentionFactory · Sitapura
100 kW · No open tickets
371 kWh
ExcellentBank branch · Kota
10 kW · Inverter offline · ticket open
0.0 kWh
Needs attention
Units generated, by half hour
Factory questions
What plant heads ask first.
How much roof do we need?
About 100 sq ft per kW on a flat RCC roof, a little less on a north-lit shed. A 100 kW plant needs roughly 10,000 sq ft.
Can a metal shed roof take the load?
Usually, with a purlin-clamped structure. We run the structure calculation before quoting, and reinforce where needed.
What size can we install?
Up to your sanctioned load under net metering. Above that, we design for captive use with export limits.
What about our night shifts?
Net metering banks daytime export against night consumption within the billing rules of your DISCOM. The audit models your actual load curve.
Is there a subsidy for factories?
No direct subsidy, but input tax credit and accelerated depreciation materially improve the return.
How long does a 100 kW plant take?
Typically 3–5 weeks from order to commissioning, with DISCOM approvals running in parallel.
Do you take over maintenance?
Yes. Our service plan covers cleaning, inspections and repairs, with RMS alerts routed to our team.
Will production stop during installation?
No. Work is planned around your shifts, and the only downtime is a short grid changeover at commissioning.
Can you finance it?
Yes, through our group financing arm or your bank. Larger sites may qualify for OPEX with no upfront cost.
What if the plant underperforms?
RMS shows it first. A technician checks the array, the inverters and the wiring; a failed part goes through its manufacturer's warranty, which we raise and follow. The generation figure in your proposal is an estimate; actual units depend on weather, shade and cleaning.
From the blog
Explained by the engineers.

Buying a system
ALMM and DCR panels: check before you sign
Two acronyms decide whether your subsidy arrives: ALMM and DCR. Here is what they mean, how to check a quote against them in five minutes, and the other questions worth asking before the money moves.
4 September 2026 · 4 min readRead the article

Monitoring and service
Dust, heat and monsoon: staying at full output
The same sun that makes Rajasthan the best state for solar comes with dust, 45-degree afternoons and a short, hard monsoon. Each takes a little from the plant. Here is what each one does, and the maintenance that gets the units back.
4 September 2026 · 4 min readRead the article

Shops, offices and factories
Factory solar in Rajasthan: payback, GST credit, depreciation
A factory takes no subsidy, and its plant still pays back faster than most subsidised home systems. The reasons are the tariff it displaces, the daytime load it matches, and two tax levers. Here is the arithmetic a plant head should see before the first site visit.
4 September 2026 · 4 min readRead the article
Factory bill audit
Send us your bill band.
An engineer reviews your bill and PIN code, then you get a WhatsApp reply within 15 minutes, 9am to 7pm.