Skip to content
Suntask

Banks, government and multi-site

Every branch. One partner, one SLA.

370+ plants built and maintained for exacting institutions. Standard designs, phased rollouts, one fleet dashboard, a quarterly board report.

A rooftop array on an office building, seen from directly above

The record

370+ sites, kept running.

This is the one page where our institutional work speaks at full volume.

  • 370+

    plants built and maintained

  • 3

    DISCOMs worked with: JVVNL, AVVNL, JdVVNL

  • 1

    monitoring platform across every site

  • State Bank of IndiaBranch rooftop programme
  • Bank of BarodaBranch rooftop programme
  • Rajasthan Gramin BankBranch rooftop programme

Multi-site method

The same plant, three hundred times.

  1. 1

    Survey

    Every site surveyed by our in-house engineers: roof, load and DISCOM data in one register, and a 3D layout per site before the design is fixed.

  2. 2

    Standard designs

    A small set of approved designs, so procurement, drawings and inspections repeat instead of restarting.

  3. 3

    Phased rollout

    District by district, with in-house crews and a published schedule your premises team can hold us to.

  4. 4

    RMS fleet view

    Every site on one screen: a generation health grade per site, alerts by branch, service tickets with response times.

  5. 5

    Quarterly ESG report

    Units generated, CO₂ avoided, uptime and open issues, in a format your board and auditors can use.

Virtual net metering

One plant, many meters.

Virtual net metering lets one solar plant offset the bills of several connections under the same owner, newly enabled in Rajasthan. For branches with no usable roof, it means solar credit without a panel on site. We handle the regulatory work with the DISCOM.

Reliability sites

When the power cannot fail.

For ATMs, data rooms and rural branches with weak grids, we design hybrid and off-grid systems with battery storage sized to the site's critical load and outage pattern.

  • Hybrid inverters with seamless changeover
  • Lithium storage sized to critical load
  • Remote alerts before a battery runs low

RMS fleet view

Every branch on one screen.

A generation health grade per site, alerts by site, tickets with response times, and the quarterly report your board asks for.

SoonRMS mobile app · Coming soon on Android and iOS

Fleet view5 of 370+ plants · illustrative
  • Bank branch · Sikar

    10 kW · No open tickets

    38.2 kWh

    Excellent
  • Bank branch · Jaipur, MI Road

    8 kW · No open tickets

    29.1 kWh

    Good
  • Home · Vaishali Nagar

    3 kW · Cleaning booked

    9.4 kWh

    Needs attention
  • Factory · Sitapura

    100 kW · No open tickets

    371 kWh

    Excellent
  • Bank branch · Kota

    10 kW · Inverter offline · ticket open

    0.0 kWh

    Needs attention
Bank branch · Sikar · todayExcellent

Units generated, by half hour

Compliance

Tender-ready.

Technical bid, compliance documents and ALMM and DCR declarations, prepared as standard.

Capability statement

A short PDF covering scope, fleet, process and references, prepared for procurement teams.

Institutional questions

What premises teams ask.

How do you run a rollout across many branches?

One standard design per branch type, a district-based install crew, and a single RMS fleet view from the first site. The programme has a named engineer for the premises team and a quarterly report for the board.

What is virtual net metering, and does Rajasthan allow it?

A share of a plant at one site is credited to another connection's bill, so a branch with no roof still benefits. Rajasthan has enabled it; DISCOM procedures are still settling, and we quote the current position for your DISCOM rather than a promise.

Do you respond to tenders and RFPs?

Yes. We supply the technical bid, the compliance documents and the ALMM and DCR declarations as standard. Send the document on WhatsApp or email and we reply with a timeline.

What service levels do you commit to?

Response and resolution times are stated in the contract by site class, with RMS alerts routed to our team and in-house technicians by district. Uptime, tickets and each site's generation health grade are in the quarterly report.

Can plants built by another vendor join your fleet?

Yes. After an audit we put them on RMS and on a service plan, so one screen shows every site regardless of who built it.

Institutional presentation

Tell us about your sites.

We reply within one working day with a proposed agenda and a sample fleet report.

Sites to solarise
WhatsAppFree bill audit