Home solar · Rajasthan
Your roof, in careful hands.
3D design before you sign. Fixed prices. Subsidy filed for you. Easy EMI. Service into year 9.

The survey visit
See it on your roof first.
An in-house engineer measures your roof and what shades it, then builds a 3D design of your home with the system on it, within 30 minutes of arriving. You walk through it together before anything is quoted or drilled.
3D design in 30 minutes, on the spot
Every panel, placed
How many panels fit, where each one sits, and what stays clear: the water tank, the staircase, the space you still want to use.
Shadows measured on site
Trees, towers and the neighbour's next floor are measured from your roof, not guessed from a satellite. The generation estimate in your proposal comes from this model.
Inverter and cable run, agreed
Where the inverter hangs, where the cable goes, where we earth. Settled with you on the roof, so install day holds no surprises.
Your approval, then the quote
The fixed quote is built from the design you approved. Change your mind at the model, not after the drilling.
Fixed-price packs
Every price, on one card.
We price off one published card, sized from your actual bills. Exact pack prices are one WhatsApp message away.
| Pack | Typical monthly bill | Central subsidy |
|---|---|---|
| 2 kW | Up to ₹2,150 | ₹60,000 |
| 3 kW | ₹2,150–₹3,000 | ₹78,000 |
| 4 kW | ₹3,000–₹3,850 | ₹78,000 |
| 5 kW | ₹3,850–₹4,750 | ₹78,000 |
| 6 kW | ₹4,750–₹5,600 | ₹78,000 |
| 7 kW | ₹5,600–₹6,450 | ₹78,000 |
| 8 kW | ₹6,450–₹7,750 | ₹78,000 |
| 10 kW | ₹7,750+ | ₹78,000 |
Subsidy figures are the central PM Surya Ghar amounts; the Rajasthan top-up is explained below.
PM Surya Ghar · Rajasthan
The subsidy, without the queue.
The subsidy is paid by direct transfer into your own bank account, not ours. We file the application, the DISCOM paperwork and the net-metering request, and we chase them until they are done.
₹30,000
per kW for the first 2 kW
₹18,000
for the third kW
₹78,000
maximum central subsidy, at 3 kW and above
+ ₹17,000
for eligible Rajasthan families under the state top-up
Will solar work on my roof
Three things we check first.
About 100 sq ft per kW
A 3 kW system needs roughly 300 sq ft of shadow-free roof. Water tanks and parapets can be worked around.
Shadow between 9am and 3pm
Trees, taller buildings and mobile towers matter most in the middle of the day. The survey measures it on site and the 3D design shows it.
Sanctioned load up to 10 kW
Home systems are sized to your sanctioned load. If yours is lower than the system you want, we raise it with the DISCOM.
After you pay
Service and support, included.
Warranties, handled by us
Panels, inverter and battery carry their maker's warranty, stated in your proposal. If a part fails, we raise the claim and fit the replacement.
Five years of service, included
Scheduled cleaning, inverter checks, and a technician who answers the phone. Five years included, then renew yearly at a published rate, for up to 10 years.
Referral loop
Refer a neighbour who goes solar with us, and your next year of service is on us.
Built for Rajasthan
Dust, heat, monkeys, storms.
Dust-cleaning cycle
Rajasthan dust can cost up to 15% of generation. We schedule cleaning to the season, and RMS flags a dirty array before you would notice it on the bill.
Monkey-guard fencing
Cable routing and guards designed for roofs that get visitors.
47° heat-rated components
Inverters mounted in shade with ventilation clearance, cabling rated for peak summer roof temperatures.
Storm-rated mount
Our desert-hardened mounting structure is engineered for Rajasthan wind loads.
Home solar questions
Questions people ask us.
How much can a home actually save?
Up to 90% of the bill, depending on roof size and how much of your use is in daylight or exported under net metering. The audit gives you a figure from your own bills, not an average.
What size system do I need?
Roughly 1 kW for every ₹800–1,000 of monthly bill. A ₹3,000 bill usually means a 3 kW pack; the calculator gives you a first estimate in a minute.
How long until the subsidy arrives?
It depends on DISCOM inspection and the national portal, typically a few weeks after commissioning. We track the application and update you on WhatsApp.
Will it work during a power cut?
A standard grid-tied system switches off during a cut for the safety of line workers. If backup matters to you, we design a hybrid system with a battery.
How long does installation take?
Most home systems up to 10 kW go up in a single day once you have approved the 3D design.
What maintenance does it need?
Periodic cleaning and an annual inverter check. Five years of service are included, and RMS tells us if anything drifts.
What happens if the system underperforms?
RMS flags the drift and raises a ticket. A technician checks the array, the inverter and the wiring; dust and shading are fixed on site, and a failed part goes through its manufacturer's warranty, which we handle. The generation figure in your proposal is an estimate; actual units depend on weather, shade and cleaning.
Can I pay in EMI?
Yes. PM Surya Ghar loans at about 7% via Rajasthan Gramin Bank, or EMI through our group financing arm. The subsidy can prepay part of the loan.
Do you use ALMM and DCR panels?
Yes. Subsidy systems require ALMM-listed, domestic-content panels, and every component is listed by make and model in your proposal.
From the blog
Explained by the engineers.

Net metering and DISCOMs
Net metering in Rajasthan: JVVNL, AVVNL, JdVVNL, step by step
Net metering is the agreement that turns your roof into a two-way account with the DISCOM. Here is how the application moves through JVVNL, AVVNL or JdVVNL, what each step needs from you, and where applications stall.
4 September 2026 · 5 min readRead the article

Subsidy and money
Rajasthan's ₹17,000 solar top-up, explained
The central PM Surya Ghar subsidy tops out at ₹78,000. Rajasthan adds up to ₹17,000 for families under its free-electricity scheme, taking the total to ₹95,000. This is the explainer for that extra amount: eligibility by connection, the payment route, and the maths for the small plant it was designed around.
4 September 2026 · 4 min readRead the article

Buying a system
ALMM and DCR panels: check before you sign
Two acronyms decide whether your subsidy arrives: ALMM and DCR. Here is what they mean, how to check a quote against them in five minutes, and the other questions worth asking before the money moves.
4 September 2026 · 4 min readRead the article
Free bill audit
Start with your bill.
A Suntask engineer reviews your bill and PIN code, then you get a WhatsApp reply within 15 minutes, 9am to 7pm.